Quality Plan
QUALITY ASSURANCE MANUAL
FOR
TESTING MATERIALS AND FRESH CONCRETE
RED SEA READY MIXED CONCRETE COMPANY
CONCRETE BATCH PLANT IN HURGHADA CITY
1. General
The purpose of this plan is to establish a procedural guide for sampling and testing deemed necessary to maintain compliance with the specification requirements. CEL will perform the required quality control tests in the field or laboratory on aggregates, concrete, moisture-density relation and in-place field density tests on fill and backfill materials.
2. PERSONNEL
CEL will assign qualified engineer (s) and, well-trained technician(s) having previous significant experience of such type of works. As a minimum CEL will assign one engineer and one technician for the anticipated level of work. The level of works and related activities will allocate the required number of personnel.
3. EQUIPMENT
The provided equipment and testing facilities will conform to requirements of ASTM standards for both concrete and earth works. CEL will maintain this equipment in a proper condition during the project. Calibration of this equipment will be carried out in accordance to their relevant standard, list of equipment is attached.
4. QUALITY ASSURANCE
All tests that will be performed both on site and in laboratory will conform to ASTM, ACI and, project specification requirements. A copy of relevant ASTM and ACI specification will be available in site laboratory. CEL laboratories are now in the training phase to obtain ISO 9001:2000.
5. SAMPLING
5.1 SAMPLING OF AGGREGATES
The sampling procedures of aggregates will be in accordance to ASTM D 75. The minimum size of sample will be in accordance to table (1) of ASTM D 75.
5.2 SAMPLING OF CEMENT
The sampling procedures of cement will be in accordance to
ASTM C 183.
5.3 SAMPLING OF FRESH CONCRETE
The sampling procedures of fresh concrete will be in accordance to ASTM C 172 and C 94. The fresh concrete samples will be obtained at the point of discharge from the truck mixer/agitators.
6-TESTING AND FREQUINCIES
CEL shall perform tests required to verify that control measures are adequate to provide work, which conforms to the project specification. These tests are summarized as follows;
7-AGGREGATES
Initial testing of aggregates will be made to conform the compliance of the source or quarry to ASTM C 33 and/or project specification requirements.
The field testing of aggregates will be in accordance to ASTM specifications and the frequency of testing will be as per the project specification requirements and / or as required by ACI 221R "Guide for Use of Normal Weight and Heavyweight Aggregates in Concrete" as shown below:
7.1 COARSE AGGREGATES (EACH SIZE GROUP)
Test |
Test method |
Test frequency |
On – site |
- Grading (sieve analysis) - Moisture content - % passing sieve No. 200 |
ASTM C 136 ASTM C 566 ASTM C 117 |
Once per day
|
|
- Specific gravity & absorption -Unit weight and voids in aggregates - Clay lumps and friable particles |
ASTM C 127 ASTM C 29 ASTM C 142 |
Once per week |
|
- Chemical analysis (Chloride- Sulfate) - Resistance to abrasion using los angles machine |
ES
ASTM C 131
|
Once per month |
Off – ste |
The acceptance criteria will be as mentioned in ASTM C33.
7.2 FINE AGGREGATE
Test |
Test method |
Test frequency |
On – site |
- Grading (sieve analysis) - Moisture content - % passing sieve No. 200 |
ASTM C136 ASTM C566 ASTM C117 |
Once per day
|
|
- Specific gravity & absorption -Unit weight and voids in aggregates - Clay lumps and friable particles |
ASTM C 127 ASTM C 29 ASTM C 142 |
Once per week |
|
- Chemical analysis (Chloride- Sulfate) - Specific gravity & absorption - Organic impurities |
ES
ASTM C128 ASTM C 40 |
Once per month |
Off – site |
The acceptance criteria will be as mentioned in ASTM C33.
8 – CONCRETE MIXING WATER AND ICE
Test |
Test method |
Test frequency |
Off – site |
- Chemical analysis (Chloride – Sulfate- T.D.S – pH) - Compressive strength -setting time |
ES spec. ASTM C 94 |
One sample per month
|
9 - ADDITIVES
Initial testing of additives will be made to conform the compliance of the source to ASTM C 494 or mill certificate the site testing as the follows:
Test |
Test method |
Test frequency |
On – site |
- Density - pH |
ASTM C 494 |
One test for each delivered |
|
1-Choride content 2- Solid content |
ASTM C 494 |
One / month |
Offsite |
10 – CEMENT
Initial testing of cement will be made to conform the compliance of the source to ASTM C 150 and/or project specification requirements for both chemical and physical properties. The cement deliveries will be tested for physical properties each 100-Ton as mentioned in ASTM C 183 or as required by the project specifications.
Test |
Test method |
Test frequency |
Off– site |
Physical analysis 1.time of setting by vicat apparatus 2. Fineness (by Blain ) apparatus 3. Compressive strength
|
ASTM C 191
ASTM C 204
ASTM C 109
|
Every 100 ton delivered |
|
Chemical analysis
4. Chemical analysis C3A
|
ASTM C 114
|
One sample per month
|
The acceptance criteria will be as mentioned in ASTM C150.
11- CONCRETE
The testing plan, frequency and acceptance criteria for both fresh and hardened concrete will be as per project specification.
Test |
Test method |
Test frequency |
On – site |
Slump |
ASTM C 143 |
- Every 40 m3 - When visual inspection indicates non-conformance - With each set of test cubes |
|
Concrete temperature |
ASTM C 1064 |
- Every 40 m3 - Not less than once per day - With each set of test cubes
|
|
Unit weight |
ASTM C 138 |
-At least one test per day (if required ) |
|
Compressive strength |
ASTM C 31 ASTM C 39 |
- One set every 100 m3 - Not less than once per day - One set consists of 6 cubes Three cubes will be tested after 7 days, Three cubes will be tested after 28 days |
|
Chloride content in hardened concrete |
ASTM C 1152 |
One sample /1000 m3 concrete mix. |
off – site |
- Frequency of tests shall be applied for each class of concrete
- Statistical analysis for 28 days compressive strength results will be submitted Monthly
12 - LABORATORY EQUIPMENTS
Initial calibration will be made to conform the compliance of the specification In the start of the work and then made calibration of compression machine according ASTM C 39 every one year.
13 - BATCH PLANT :
Inspection plan of batch plant will be in accordance to project specification in addition to the requirement of ASTM C 94 and QC manual section 3 (plant certification check list) of national ready mixed concrete association. Calibration will be done every 6 months.
The results will be submitted to owner by the third day following completion of the test. Results of field density tests will be submitted to the owner immediately upon completion of the test. The reports will contain all the required information as defined by project specification.